MAIN GAS PIPE LINE
Main gas distribiution pipe for Gas – Stove and ovens are being cutted at necessary – size , then are being processed by a ) Driling b ) Screwing c ) Forming d ) Bending e ) Forging f ) Welding. After all these process, They are ready to be sent to Assembly – Line.
ALUMINIUM PIPE LINE
Aluminium pipes which are needed for Gas – Distribution of Gas Stove and Ovens are being processed as forging, forming. After these processes, They are sent to Assembly – Line by fixing to the Gas – Mixed Room.
ASSEMBLY LINE
Valves are mounted to the “ Main – Gas – Distribution Pipe “ which were already prepared . According to the types and Forms of Gas – Stove and Ovens, The Group of “ Aluminium Pipe “ and “ Euro – pool “ which are prepared by forming in accordance with the types and shapes of the group of “ Gas – Stove “ and Ovens, are installed to the valves with suitable apparatus.After finishing the installation, the group of “ Alüminium – Pipe “ and “ Euro – Pool “ are tested by “ ATEQ Test Machine “ against gas - leakage and are ready for Despatchment.